Wind Tunnel and Field Testing
Designed to correlate. Every test planned to deliver datasets comparable against simulation.

What we provide
Delivered as one programme, or as one workstream inside yours.
Wind tunnel testing
Model-scale development and full-scale testing with the actual vehicle, from test design to data reduction.
Homologation
Aerodynamic sign-off to specific protocols, including full-scale tests for every Le Mans Hypercar and GT3.
Field testing
Track and flight testing: constant-speed zones, coast-downs and flow visualisation, with engineers at the event.



How we design a test
We map the variables of interest, which sets instrumentation, runs and budget. We decouple them with constant-speed zones, attitude control and monitored conditions. We instrument for correlation, then deliver a comparable dataset with facility effects and uncertainty recorded. Most of the value in a test campaign is defined before the fan is switched on.
Proven results
Le Mans homologation, 2023–2026: full-scale wind tunnel homologation tests for every Le Mans Hypercar and Le Mans GT3, on behalf of the ACO. Platform correlated on the car: 0.35 mm ride-height agreement at both axles across a lap. In-event trackside support from our engineers.
How we engage
Test programme design. Test execution. Trackside support at the event.